DRC designed and undertook the assessment works under challenging conditions that required utilising drilling and excavation technologies suited to site conditions with limited access and subject to heritage overlays, liaising with various offsite stakeholders regarding essential offsite works and completing the works on budget and within limited timeframes critical to the profitable development of the site.

  • 735 Glenferrie Road, Hawthorn
  • 735 Glenferrie Road, Hawthorn
  • 735 Glenferrie Road, Hawthorn
  • 735 Glenferrie Road, Hawthorn
  • 735 Glenferrie Road, Hawthorn

Client:

May Constructions Pty Ltd

Project Type:

Historical motor garage and petroleum sales site to be developed into a four level high density residential development with basement parking

Works Completed:

Soil Assessment, Soil Vapour Assessment, Petroleum Underground Storage Tank Removal Works and Remediation, Groundwater Assessment and Environmental Audit

Project Outcome:

Statement of Environmental Audit on schedule and on budget

Project Description:

DRC designed and undertook the assessment works under challenging conditions that required utilising drilling and excavation technologies suited to site conditions with limited access and subject to heritage overlays, liaising with various offsite stakeholders regarding essential offsite works and completing the works on budget and within limited timeframes critical to the profitable development of the site. DRC also worked closely with EPA Victoria and the Environmental Auditor throughout the project.

Our Projects

735 Glenferrie Road, Hawthorn

735 Glenferrie Road, Hawthorn

1 January 1970
DRC designed and undertook the assessment works under challenging conditions that required utilising drilling and excavation technologies suited to site conditions with limited access and subject to heritage overlays, liaising with various offsite stakeholders regarding essential offsite works and completing the works on budget and within limited timeframes critical to the profitable development of the site.
Arden Gardens

Arden Gardens Risk Management

1 January 1970
DRC took the reigns on this project and delivered rapid assessment using world class technologies combined with local experience to complete assessment and remediation works on budget and on schedule to allow construction commencement and progression
31-37 Stewart Street and 12-20 Hardy Street, Brunswick

31-37 Stewart Street and 12-20 Hardy Street, Brunswick

1 January 1970
DRC’s design and implementation of the assessment works included the use of drilling equipment that was specifically adopted to suit a site with limited access and new soil vapour and groundwater sampling technologies that are more cost and time effective than the more widely used standard sampling methodologies.