Former Bus Depot - Barkers Road, Hawthorn East
1 December 2025
Full Assessment, Remediation and Re-Development of a Former Bus Depot. DRC provide expert advice, service and assistance remove USTs beneath structural walls, completed clean-up works and completed offsite groundwater assessment and remediation to meet client objectives and Audit objectives.
Read more >
School Development Site
1 December 2025
Time Sensitive rapid support to the builder for remediation works and vapour management system design services. DRC provided rapid response to support urgent site remediation works and urgent design response to enable redevelopment of a heavily contaminated former automotive facility into a school in an emerging brownfields redevelopment area of Inner Melbourne.
Read more >
Arden Gardens Risk Management
1 January 1970
DRC took the reigns on this project and delivered rapid assessment using world class technologies combined with local experience to complete assessment and remediation works on budget and on schedule to allow construction commencement and progression
Read more >
31-37 Stewart Street and 12-20 Hardy Street, Brunswick
1 January 1970
DRC’s design and implementation of the assessment works included the use of drilling equipment that was specifically adopted to suit a site with limited access and new soil vapour and groundwater sampling technologies that are more cost and time effective than the more widely used standard sampling methodologies.
Read more >
735 Glenferrie Road, Hawthorn
1 January 1970
DRC designed and undertook the assessment works under challenging conditions that required utilising drilling and excavation technologies suited to site conditions with limited access and subject to heritage overlays, liaising with various offsite stakeholders regarding essential offsite works and completing the works on budget and within limited timeframes critical to the profitable development of the site.
Read more >
Ballarat Station Precinct
1 January 1970
An assessment of multiple layers of uncontrolled fill soils and underlying natural soils to provide the most cost effective and straightforward procedure for the removal and offsite disposal of up to 8000 m3 of soils to be excavated as part of the proposed development works.
Read more >